PROJECT | EALING STREET, ANNERLEY
DESCRIPTION | DUAL OCCUPANCY |SUBDIVISION | 1 LOT INTO 2 LOTS
SITE AREA | 612M²
NEW LOT SIZES | PROPOSED LOT 66 = 301M² | PROPOSED LOT 67 = 304M² |COMMON PROPERTY = 1M²
ROLE | PRE-LODGEMENT MEETING | DEVELOPMENT APPLICATION | PROJECT MANAGEMENT
STATUS | APPROVED
BUILDING DESIGNER | PJM DESIGN + DRAFTING
SURVEYOR | ORION SPATIAL SOLUTIONS
HYDRAULIC ENGINEER | CIVIL WORKS ENGINEERS
DEVELOPER | PRIVATE
NOTES | THE SITE WAS SUBJECT TO OVERLAND FLOW FLOODING AND REQUIRED A FLOOD REPORT TO DETERMINE THE HABITABLE FLOOR LEVELS. A SUBDIVSION COULD ONLY BE ACHIVIED IF THE DUAL OCCUPANCY WAS CONSTRUCTED FIRST, WHICH WOULD THEN ALLOW FOR THE SUBDIVISION